A survey was made in consultation with the local farmers for construction of a Small Water Impounding Dam (SWID) across the Bhurahi River which ultimately merges into the Hardi (Banke) river in the downstream. Based on the site conditions, design and estimates for the proposed SWID was prepared for implementation.



